Delta-EM and ABIndustry signed a contract for the joint-delivery of a hazardous waste Energy-from-Waste facility for Remondis in Poland.
| Industry | Regional Hazardous Waste Incineration Plant |
| Client | REMONDIS Sp z o.o |
| Application | Hazardous solid & liquid waste incinerator, Energy recovery, Flue gas cleaning. |
| Pollutants | Industrial solid & liquid waste, healthcare waste, etc. |
| Systems | Ram feeder for solid waste, packed waste & healthcare waste elevators, liquid waste injection systems, rotary kiln & SCC, waste heat boiler, flue gas cleaning system including dry reactor with lime and PAC injection, bag filter, DeNOx & de-dioxin reactor, wet scrubber, combustion air supply and flue gas extraction system. |
| Capacity | 4.5 t/h (16MW) |
| Location | Jezuicka Struga, Poland |
| Year | Start operation end of 2026 |

